Manning Intermediate
larger imageMove mouse over the image to magnify
Designed by Stufkens and Chambers Architects, the brief was to design a new school hall, foyer and administration block. The main entrance provides a dramatic welcome and acts as the axis of the school. The main hall is articulated by alternative wall panels to reflect the schools prevailing artistic side and also optimise interior acoustic performance. Exterior cladding is a combination of Titanboard and metal cladding.

The team at Contract Construction worked with the architect to seamlessly incorporate design changes and the school requirements as the project progressed. The final stages of construction were complicated by the February earthquake, however the team worked tirelessly to complete the works and hand over a quality finished product.
00889

Manning Intermediate

New School Hall and Administration Block
Enquire

You might also be interested in ...

Guardian Trust
Enquire for price
Telstra Clear
Enquire for price

FOLLOW US

linkedin

CONTACT US

P: (03) 379 6277
F: (03) 379 8499
E: admin@contract-construction.co.nz
Contract Holdings Limited
28 Buchan Street
P O Box 641
CHRISTCHURCH
  • p 5(copy)
  • s2
  • NZRIA 2015 CURRENT-712
  • Member logo colour(copy)
  • s5