The Contract Group has an impressive portfolio of successfully delivered commercial projects.  Below is a small sample of the many projects we have constructed.
 

Merritt Building - Victoria Street


Merritt 1The Merritt Building on Victoria Street is the first of it's type to be built in New Zealand and Contract Construction are proud and excited to be involved with such ground breaking construction.  Structurally designed by Kirk Roberts Consulting Engineers Ltd, the building is a post tensioned timber frame, relying on strand cables within the beams and steel energy dissipator clamps at the junctions to seismically strengthen and brace the building.  The building is designed to excel in a staggering one-in-2500-year event with controllable, minimal and repairable damage. 

The architectural design was completed by Sheppard & Rout Architects Ltd.  It is clad in glass on two sides to display the warmth of the timber interior along with the quake resistant dissipators and post tensioned strand cable ends.  Horizontal louvers on the North and closely spaced vertical louvers on the West respond to the building orientation and street presence.

Manning Intermediate School Hall & Administration Block

Hoon Hay Road

Manning IntermediateManning IntermediateDesigned by Stufkens + Chambers Architects, the brief was to design a new school hall, foyer and administration block.  The main entrance provides a dramatic welcome and acts as the axis of the school.   The main hall is articulated by alternative wall panels to reflect the schools prevailing artistic side and also optimise interior acoustic performance.  Exterior cladding is a combination of Titanboard and metal cladding.

The team at Contract Construction worked with the architect to seamlessly incorporate design changes and the school requirements as the project progressed.   The final stages of construction were complicated by the February earthquake, however the team worked tirelessly to complete the works and hand over a quality finished product.


Guardian Trust Office

328 Durham Street, Christchurch City Centre

Copper CladdingConstruction of this stunning building began in July 2005 and was completed in June 2006.  Designed by Noordanus Architects, the prominant feature of this building is the curved copper wall.   The project recived a Gold Award in the House of the Year 2007 - Commercial Projects category.

The unusual shape of the building combined with the range of different building materials posed a number of challenges for our tradesmen.  As well as being curved, the copper wall is also raking on both horizontal and vertical planes.  Exterior claddings included copper, ebonized cedar, stack bond concrete block and aluminium.

The location of the site on a busy central city intersection meant extra care was required to protect vehicle and pedestrian traffic.

Click here to read more about this project.

Refurbished Section

Guardian Trust

Under Construction

Interior Stairs

 

Salisbury Park Apartment Complex

226-242 Salisbury Street, Christchurch City Centre

 

Salisbury ParkSalisbury Street FrontageConstruction of this multi unit apartment complex began in November 2006 and was completed in June 2008.  The precast construction building was designed by Mike Marshal Harrington Architects and covers a substantial 4770 m2.

Given the proximity to a busy road meant additional traffic management and sediment control measures were required.

 

 

 


Telstra Clear

Telstra Clear

The Telstra Clear building has fast become an architectural icon standing out as a bold example of contemporary design and construction. With its strong visual stance, clean lines and innovative cladding, this building captures the eye of all who pass by.

With pronounced geometric lines, this building leads the eye through to a soft flowing curve facing the street entry. Inside, the open atrium leads to the busy administration and operations arm of the company.
Cutting edge design and construction is apparent in all aspects of the building both internally and externally, reflecting the type of operation it houses. The successful construction process was a result of careful planning and a high level of communication amongst all involved parties.

Buried in the base of the building is the technological department. Integrated into this intensive atmosphere is the human side, accommodating the call centre that caters for their customers. Operating twenty four hours a day this building needs to deliver excellence both in its artistic merit and practical application, success has been achieved on both counts.

Other Projects


Brisbane Street Warehouse - 21 Brisbane Street, Sydenham

Brisbane Street


Connetics Office - Locke Place

Connetics


Bakery & Retail Development - Cnr Durham & Sandyford Streets, Sydenham

Bakery & Retail Development

Under Construction


Apex Rentals - Roydvale Avenue

Apex Car Rentals


Hollands Suzuki

Hollands Suzuki


Mitre 10 Mega - Main South Road, Hornby

Mitre 10 Mega

 

 


Contact us today to discuss your next project

(03) 379 6277  btn contact

FOLLOW US

linkedin

CONTACT US

P: (03) 379 6277
F: (03) 379 8499
E: admin@contract-construction.co.nz
Contract Holdings Limited
28 Buchan Street
P O Box 641
CHRISTCHURCH
  • p 5(copy)
  • s2
  • NZRIA 2015 CURRENT-712
  • Member logo colour(copy)
  • s5